Hartman and Hartman is on site building a metering and regulation station that includes over 800 feet of 30” underground pipe. In addition, over 200 feet of 30” above ground pipe will be fitted and installed onto pipe racks. Other notable station features include:
• A single 30’ x 36” Pig Launcher / Receiver
• Waste Fluid Tank • (2) Phase One 42” Peco Filters
• Phase One and Two Metering Skids
• Phase One and Two Regulation Skids
Our team installed all foundations, provided and installed all of the structural steel, as well as preformed the entirety of the electrical installations.